February 2013
This Cleveland Airport Sheraton Hotel commissioned Remodel Me Today to renovate and remodel their presidential suite. RMT prepped all walls and conditioned for 54 inch vinyl wall covering. Hung all wall coverings. Basically gutted one full bathroom and half bath. Re-conditioned both spaces with new cabinets, counters and fixtures. Removed existing floor coverings throughout the entire space and replaced with new carpet and tile work.